• <ul id="fabv4"><meter id="fabv4"></meter></ul>
    <ruby id="fabv4"><pre id="fabv4"><td id="fabv4"></td></pre></ruby>
      <ul id="fabv4"></ul>
    1. <blockquote id="fabv4"><meter id="fabv4"></meter></blockquote>
    2. <ul id="fabv4"><meter id="fabv4"></meter></ul>
    3. New Products

      • 1
      • 2
      • 3
      • 4
      • 5
      • 1
      • 2
      • 3
      • 4
      • 5
      Home>News>Company News>Tress Floor, sealed smoothly

      Tress Floor, sealed smoothly

      Date: 2013/4/17      Source: Zhejiang Tress Electronic Technology Co.,Ltd.     Views: 5480

      April 15,2013, Hubei Tress Industrial Park-Science and technology building has been

      sealed smoothly as schedule.

      From the day we started the  Science and technology building project , due to all 

      the parties participated in the construction,the project has progressed smoothly , 

      therefor,e we have the sate production,well construction, civil construction. Meanwhile, 

      we hope that the parties to the Participation cap today as a starting point to further 

      strengthen the process management, improve construction methods, Tress building construction

      to be a quality engineering.

      Science and technology building construction of the main three, construction area of 6064 

      square meters, the main part of the project completed in May 2013.



       

       

      制服丝袜人妻无码在线,国产精品线路一AV,日本老肥熟视频,日本亚洲人成网站18禁
    4. <ul id="fabv4"><meter id="fabv4"></meter></ul>
      <ruby id="fabv4"><pre id="fabv4"><td id="fabv4"></td></pre></ruby>
        <ul id="fabv4"></ul>
      1. <blockquote id="fabv4"><meter id="fabv4"></meter></blockquote>
      2. <ul id="fabv4"><meter id="fabv4"></meter></ul>